Central Buildings Redevelopment

Holyhead, Anglesey

Feasibility studies
Design
Planning
Building regulations
Tendering
Project management
Visuals
Technical support

Project brief

Full restoration of a prominent town centre building on a prominent junction of Holyhead High St, with the proposed use being a café on the ground floor and dance studio above.
Central 4

Design details

The three- storey- high structure provided plenty of floor space to provide the brief, albeit an interesting challenge in terms of separating both uses. The design intent was to ensure that a comfortable and functional space is provided within whilst ensuring that the building envelope is sensitively restored and protected.

Design details

The three- storey- high structure provided plenty of floor space to provide the brief, albeit an interesting challenge in terms of separating both uses. The design intent was to ensure that a comfortable and functional space is provided within whilst ensuring that the building envelope is sensitively restored and protected.

Location:

Timeline:

Status:

OLD PHOTO

Interested in working together?

Fill out the form and we’ll respond within 48 hours.

Bodnant Pin Mill
Heritage, Conservation
Bodnant Pin Mill: learn more about this project
DEWIS have worked with us on several projects providing architectural services from site inception to fully worked up schemes. They have always been professional and engaging in their approach looking to deliver a high-quality product. They share our passion for innovation and have been closely involved in our early off site manufactured modular schemes.
David Kelsall, Cartrefi Conwy

THANK YOU!​

Your form has been submitted successfully. We will be in touch soon.