-Becoming involved at Stage 4, putting together a building control pack and drawings, providing technical support and technical design made for an interesting collaborative working process with our client Watkin Jones plc.
Design details
This central Chester block of student accommodation ensured a high level of attention to detail that we always ensure is provided.
Design details
This central Chester block of student accommodation ensured a high level of attention to detail that we always ensure is provided.
We were delighted to be guided by DEWIS as they prepared a feasibility study for us in Deiniolen. Their interest in history and old buildings was an essential quality for the project. It was so easy to work with them.
Sian Tomos, Chief Executive GISDA
THANK YOU!
Your form has been submitted successfully. We will be in touch soon.